Three-dimensional powder mixer using manual
Time  2024-04-03     Browsing times  次
\
 
One, three-dimensional powder mixer and power unit should be installed firmly. Some powder mixing machine is fixed operations, should be fixed in the cement foundation; some powder mixing machine is installed in the mobile operation, the unit should use made of the base angle, and to ensure that the engine (diesel or motor) and dry powder mixing machine pulley groove in the same plane of rotation.

Two, after the installation of dry powder mixer to check the fastening of the fastening parts of the fasteners, if there is a loose to tighten. At the same time to check the tightness of the belt is appropriate.

Three, dry powder mixing machine before starting the first hand, the rotation of the rotor, check the tooth claw hammer, and the rotor is flexible and reliable, in the case of collision free phenomenon, and whether the rotation direction to the direction of the arrow machine, power machine and powder mixed lubrication is a good machine.

Four, dry powder mixing machine should first idling after starting 2~3min, and then feeding work no abnormal phenomenon.

Five, the work should pay attention to the operation of the dry powder mixer, feeding should be uniform, in order to prevent the blockage of the stuffy car, do not have to work long hours. If there is a vibration, noise, bearing and the body temperature is too high, the phenomenon of outward spray and other phenomena, should immediately stop inspection, troubleshooting, can continue to work.